|
 |
|
|
|
 |
|
| Sales |
|
| Our professional team ensures that all requirements of our customers across the globe are carefully evaluated during the initial stages of project development in order to arrive at optimum technical solution. |
|
 |
|
 |
|
| Technical Assistance |
|
| Customer comes first - with this policy after-sales technical assistance has always been our main focus area. With this we ensure: A holistic solution to customer's problems; timely and valuable technical assistance throughout the entire life cycle of the machine; providing integrated line solutions complying with cGMP and regulatory norms; dedicated design and service engineers to meet new requirements. |
|
| Our after-Sales Service team boasts of expert engineers who attend customer calls across the globe promptly and provide solution to any kind of query relating to machine operation. To ensure the highest levels of technical assistance, Pam-Pac employs trained, skilled technicians who are kept constantly up-to-date with the latest technical developments in their sector. We have a fuller understanding of customers' production needs and can thus ensure high levels of customer satisfaction. |
|
 |
|
 |
|
| Technical Training |
|
| To help our customers achieve best performance from our machines, we recommend technical training courses for machine operators, which are taught by qualified Pam-Pac engineers. Training courses equip customer's operators with the knowledge of machine operations, efficient maintenance, and how to carry out troubleshooting procedures in the easiest & fastest possible way. Our experts also explain the correct use of the documentation supplied with the machine. In the very beginning of the year training schedule is finalized and we release our training calendar. Our customers can plan training of their personnel well in advance with the help of training calendar. |
|
| Special attention is given to the critical stations of the machine. We also run hands-on courses at customers' premises at times to be agreed with the customer. Assessment sessions are held after training to check trainee progress. Trainees who successfully complete their assessment tests are issued with an Attendance Certificate. |
|
 |
|
 |
|
| Spare parts |
|
| Pam-Pac ensures rapid delivery of any component to be replaced. A list of recommended spare parts is supplied along with the machine. Minimum inventory levels of critical spares are always maintained to ensure quick deliveries across the globe. SAP enabled process ensures lower lead times and quick replenishment to maintain critical inventory levels of spares. |
|
 |
|
 |
|
| Change Parts |
|
| With more than 1000 successful installations world over, Pam-Pac meets
the uphill tasks of designing and delivering numerous change/format
parts for various kinds of output on Pam Pac machines. The biggest
challenge faced by our customers in today's scenario is to launch their
product immediately in the market once they achieve all necessary
approvals. Our designers working in tandem with our customers ensure
timely delivery of format parts. |
|
 |
|
 |
|
| Instruction Manuals |
|
| Instruction manuals for machines and attachments are provided along with the machine delivery. The manuals are developed in easy and understandable language and supported with lot of drawings and diagrams for easy understanding at all levels. |
|
| Electrical documentation including functional drawings, I/O tables, PLC and microprocessor cards lists are also provided. Instruction manuals are also provided on CD-ROM as an option. |
|
 |
|
 |
|
| Validation and Calibration |
|
| On request we provide customers with a comprehensive package of documentation for on-site validation procedures. Various solutions are available to suit different customer needs. In the pharmaceutical industry, validation involves documenting the trials and tests which prove that a process produces a product which complies with particular specifications and quality attributes. The validation of a production process must provide evidence that all components of the equipment or plant used are designed and manufactured in compliance with documented quality criteria. Thanks to its certified quality system, quality plans and quality procedures, Pam-Pac has proved that its machines comply with customer requirements and specifications. The documentation and records issued by Pam-Pac during the machine life cycle allow the customer to reduce validation costs and times. |
|
 |
|
 |
|
|
|